Case Study

LMS Curtailment Study (100 MW Offshore Wind Farm)

Curtailment risk is no longer theoretical for offshore wind projects.

An LMS curtailment study helped the developer understand the likely scale and timing of curtailment, quantify export and revenue impact, and identify practical strategies to reduce exposure. As grid constraints tighten, transparent modelling and operational playbooks are essential to keep projects bankable.

LMS curtailment study visual
LMS warning window analysis for a 100 MW offshore wind farm.

Outcomes

  • Clarity on curtailment scale and timing

    Modelled realistic LMS scenarios to surface when and how exposure materialises.

  • Revenue impact quantified

    Export and revenue sensitivity quantified across operating states and warning windows.

  • Actionable risk-reduction plan

    Operational strategies and design levers to reduce curtailment and strengthen project economics.

Operator playbook for LMS warnings

  • Avoid trips by trimming export just enough to stay within limits.

  • Optimally dispatch storage or hybrid assets during warning windows.

  • Shift maintenance into lower-risk periods to protect availability.

Accurate curtailment modelling, paired with an optimal operational strategy, is now essential to build confidence with investors and stakeholders.

If you would like to understand how LMS curtailment could affect your connection, or turn LMS Warning Messages into actionable dispatch, let’s talk. Drop us a message at info@rensolv.com.

Want LMS warning messages translated into actionable dispatch playbooks?

Turn LMS warnings into clear dispatch and mitigation moves before trips occur.