Grid Connection Support
We support you throughout the entire grid connection process—from the initial stages to final approval. Our services begin with identifying technically and financially viable grid connection options. We liaise with the Distribution Network Operator (DNO) and assist with the preparation and submission of grid connection applications for both distribution and transmission networks. Once an offer is received, we conduct a thorough technical review, highlight key aspects, and provide clear recommendations for the next steps.
Efficient design of the site and a seamless grid connection application.
Optimal site design:
- G99 and DRC applications
- Site single line diagram
- Fault level studies
- DNO liaison
Our full set of services include:
- Preliminary assessment prior to grid connection application.
- Completing ENA connection application forms
- Completing National Grid connection application forms
- Connection related power system studies and DRC schedules
- ENA connection application review
- Connection offer review for risk identification
- Risk assessment and advice on existing offers
- Expert support during grid connection proces